Product Detail :
|
Design Construction, Supply, Erection, Installation, Testing and Commissioning of 0.15mld Hospital Sewage Cum Effuent Treatment Plant (rcc Structure) at Government Psychiatry Disease Hospital Based on Sequential Batch Reactor Technology with Scada System and All Other Works Contingent. Laying of Rcc Pipe 300mm Dia, 250mm Dia & 200mm Dia Sewer Line with Construction of Allied Manholes and Storm Water Drainage with 300mm and 200mm Half Dia Pipes Disposal System/
|