Product Detail :
|
Construction of uni-directional tunnel i.e. length of 5.449/5.417km (tube-1/tube-2) and its approach road from km 0+000 to km 6+405 of total length 6.405 km on sudhmahadev- daranga section on nh-244 in the union territory of on epc mode (sdi).
|